How to Copy the Annual Schedule from a Previous Year
The ISA ASB can be accessed at https://instructionalscheduling.ucsd.edu/scheduler/annual-schedule-builder
NOTE: This can only be done if the current Annual Schedule Builder (ASB) is completely blank. It cannot be undone. If you need to make changes (after you copy a previous year), you will need to do manual updates (see KB0033136). The copy will include the Summer Quarter following the academic year.
Steps to Take
- Click on the “Copy schedule from a previous year” button. (① below)
- Select the year that you would like to copy, which will bring up a list of the courses. (② below)
- If you need to go back one step and choose a different year, click on the “Change year” button. (③ below)
- If you need to go back one step and choose a different year, click on the “Change year” button. (③ below)
- Once you have the right year chosen, select your desired copying options:
- Copy the course instructors too (④ above)
- Copy the non-primary class components too (⑤ above)
- Copy the scheduled days and times too (⑥ above)
- Select/deselect individual courses to copy or leave all the courses selected to copy all (⑦ above)
- Click the “Copy selected YYYY-YY classes to YYYY-YY” button. (⑧ below)
If you have trouble copying a schedule over, contact the ISA team at isa-help@ucsd.edu.